資料夾名稱是 20140207化工機械專案。「CAD圖」裡的 .dwg 是 2 月 8 日到 18 日,3ds Max 場景和渲染圖集中在 2 月 11 日到 26 日,Flash 流程動畫的影片版在 3 月 19 日輸出。哲宇確認客戶是高霖再生能源。
渲染圖把製程拆成幾套設備:列管式預熱系統、板式冷凝系統、100T 循環冷卻系統、分餾桶與接收桶。第一張加了中英文標示,右下角的圖例寫 a→b→c Preheating、d Fractionating、e→f→g 1st-Cooling、g→h 2st-Cooling、i Receive Product,原檔拼字照舊。
流程動畫的片頭寫「高霖再生能源股份有限公司 工程流程圖」。下面 20 秒從進料螺桿和脫氯槽開始,接著是一級與二級水洗、氣液分離、暫存桶、列管式預熱和板式冷凝。
The folder is named 20140207 chemical machinery project. The .dwg files in its “CAD圖” subfolder are dated 8 to 18 February, the 3ds Max scenes and renders cluster between 11 and 26 February, and the video version of the Flash process animation was exported on 19 March. He confirmed the client was GL Renewable Energy.
The renders split the process into separate pieces of equipment: a tubular preheating system, a panel condensation system, a 100T circulation cooling system, a fractionating barrel and a receiving barrel. The first image carries Chinese and English labels, and its legend at bottom right reads a→b→c Preheating, d Fractionating, e→f→g 1st-Cooling, g→h 2st-Cooling, i Receive Product, spelling as in the original.
The process animation opens on “GL Renewable Energy Co., Ltd., engineering flow chart”. The 20 seconds below start at the screw feeder and dechlorination tank, then move through the first and second water scrubbers, gas-oil separation, the temporary barrel, tubular preheating and panel condensation.